Timely communication
Sales manager :Leonia||Email mailto : sales3@zxdh2.com
Skype/WeChat :18030175807||Mobile/WhatsApp :+86 18030175807
Technical specifications
|
P/N |
ZXD-24 |
|
Hydrogen Production(m3/h) |
24 |
|
Oxygen Production(m3/h) |
12 |
|
Hydrogen Purity(V/V) |
≥99.99% |
|
Oxygen Purity(V/V) |
≥92.5% |
|
Operating load |
50%-100% |
|
Working Pressure(MPa) |
1.5~2.6 |
|
Hydrogen Moisture Content(g/m3) |
≤4 |
|
Hydrogen Alkalinity(mg/m3) |
≤1 |
|
Working Temperature(℃) |
85±5 |
|
Cooling water flow(m3/h) |
3.6 |
|
DC power consumption(kW·h/m3H2) |
≤4.3 |
|
External dimension of electrolyzer L×W×H (mm) |
1900x1160x1400 |
|
Electrolyzer Weight(kg) |
4300 |
|
Alkali concentration |
30% KOH |
|
Circulation quantity of alkali liquor(m3/h) |
1.9~2.2 |
① Our goal:
Zhongxinda's goal is to be a “standard” in this area.
② Our mission:
Our mission is to reduce the cost of water electrolysis while meeting the
most stringent industry standards by providing professional technology,
products and services.
③ Our vision:
Our vision is to promote green hydrogen globally through renewable energy
and set a new benchmark in the industry.
|
No. |
Technical features of H2 generator by water electrolysis |
|
1 |
Modular and pressurized electrolyser with Bipolar Technology, long life time without any maintenance; |
|
2 |
Valves on main processing lines to be imported from Swagelok, USA |
|
3 |
asbestos membrane used in the electrolyser. |
|
4 |
Regulating diaphragm valves to be imported from Jordan, USA |
|
5 |
Analysers (Online) from Panametric, USA |
|
6 |
316L SS material for process pressure vessel; |
|
7 |
Siemens PLC configuration for the control system; |
|
8 |
36 cells in one single electrolyser with DC voltage 36V, DC current 700A to guarantee the H2 flows 5NCMH; (the detailed parameters are decided during the detailed engineering design). |
|
9 |
Special process design for hydrogen purification unit, so there is no loss of gas when the dryer is in regeneration state. |
|
10 |
The hydrogen generator are very compact with high reliability, all piping and cabling works within the skid are completed before ex-works, saving the on-site erection engineering time. |
ConTACT US : http://www.zxdh2.com/
Sales manager :Leonia||Email mailto : sales3@zxdh2.com
Skype/WeChat :18030175807||Mobile/WhatsApp :+86 18030175807
contact supplier or email to for transport and cleanrance agent